# Industrial Chiller Procurement Guide for ICA-15 Air-Cooled Models
Understanding the ICA-15 Air-Cooled Industrial Chiller
The ICA-15 air-cooled industrial chiller represents a robust cooling solution designed for medium-scale industrial applications. These units offer reliable temperature control for processes requiring precise cooling in manufacturing, food processing, and laboratory environments.
Key Considerations Before Purchase
Cooling Capacity Requirements
Before selecting an ICA-15 model, carefully assess your cooling needs. The ICA-15 series typically offers cooling capacities ranging from 10 to 15 tons (35-53 kW). Consider factors such as heat load, ambient temperature, and required temperature stability.
Energy Efficiency
Evaluate the unit’s coefficient of performance (COP) and energy efficiency ratio (EER). Modern ICA-15 chillers often feature variable speed compressors and advanced control systems that optimize energy consumption.
Technical Specifications to Review
- Refrigerant type (R-407C or R-134a are common)
- Compressor technology (scroll or screw)
- Noise levels (typically 65-75 dB)
- Electrical requirements (voltage, phase, and frequency)
- Physical dimensions and weight
Installation and Maintenance Factors
Space Requirements
Air-cooled chillers require adequate clearance for proper airflow. The ICA-15 models typically need 3-4 feet of clearance on all sides for optimal performance.
Maintenance Accessibility
Consider ease of access for routine maintenance tasks such as coil cleaning, filter replacement, and refrigerant checks. Some ICA-15 models feature front-access designs for simplified servicing.
Vendor Selection Criteria
When choosing a supplier for your ICA-15 air-cooled chiller:
- Verify manufacturer certifications and industry experience
- Check warranty terms and after-sales support
- Evaluate lead times and delivery options
- Review available customization options
- Assess local service network for maintenance needs
Cost Analysis
While the initial purchase price is important, consider the total cost of ownership including:
Cost Factor | Considerations |
---|---|
Energy consumption | Calculate annual operating costs based on your usage patterns |
Maintenance | Factor in routine servicing and potential part replacements |
Downtime impact | Consider productivity losses during maintenance or failures |
Final Procurement Checklist
Before finalizing your ICA-15 air-cooled chiller purchase:
- Confirm all technical specifications match your requirements
- Verify compliance with local regulations and standards
- Review installation requirements with your facilities team
- Confirm delivery timeline matches your project schedule
- Document all warranty and service agreements
By carefully considering these factors, you can ensure your ICA-15 air-cooled industrial chiller procurement meets both your immediate cooling needs and long-term operational requirements.